search success chat linkedin google-plus telephone multimedia youtube linkedin instagram right-arrow mobile-phone
Support
Télécharger les brochures
EcoGate
preloader

juillet 23, 2021

Top marks from Wärtsilä

WÄRTSILÄ who recently participated in a Factory Acceptance Test of a 90 kVA 400 Hz ground power unit including a 28 VDC output.

This unit will soon be shipped to Wärtsilä’s facility in Hamburg and from there, to the shipyard where the installation will take place.

Apart from approving the GPU, the two representatives from Wärtsilä gave top marks to the ITW GSE facility. They were taken by surprise by the relaxed atmosphere and the sharing of information already in the hallway where big posters show the Quality System, the production planning, and the overview of all employees.

Mrs. Karen Bethe, Quality Manager at Wärtsilä, especially noticed the availability of all appropriate testing tools plus the professionalism of the test engineers that “knew what they were talking about and could answer all questions”.

Mrs. Bethe further told that the 90 kVA unit was not the first order placed with ITW GSE.
Hopefully, it will not be the last either.

 

You can read about the unit here.

 

itw gse 2400 compact gpu Wärtsilä

More news

Juin 18, 2026, posted in News

ITW GSE Power Share Named Product Leader of the Year

Award-winning innovation for the electric ramp We are proud to announce that Power Share has been named Product Leader of the Year by Ground...

Juin 12, 2026, posted in News

Les objectifs de durabilité des aéroports de l’UE stimulent la demande en solutions PCA flexibles

Les aéroports européens sont soumis à une pression croissante pour réduire leurs émissions, améliorer leur efficacité énergétique et accélérer la transition vers des opérations...

Juin 12, 2026, posted in News

Offre d’emploi – Coordinateur des pièces de rechange

C’est l’occasion de rejoindre notre équipe ! Nous recherchons un coordinateur des pièces de rechange supplémentaire pour rejoindre notre équipe d’assistance basée à Odense,...

Juin 12, 2026, posted in News

Dans les coulisses : comprendre le parcours des pièces de rechange

La livraison de la bonne pièce de rechange au bon endroit et au bon moment est un élément essentiel du soutien aux opérations aéroportuaires...